Site Services

Experienced site supervision, when you need it most

The defects liability period is one of the most demanding parts of any commercial project. We provide experienced supervisors and qualified carpenters who can step in and manage it on your behalf, so your team can move on to the next job.

2020-01-29 11.01.20

Defects Liability Period Management

After handover, the defects liability period requires someone patient, experienced and capable of managing trades, owners and outstanding works. Our personnel can step in and manage the full process on your behalf.

What our crews can manage on-site:

  • Minor repairs and make-goods
  • Coordinating trades back on site
  • Owner inspections and items flagged during walkthroughs
  • Ensuring all outstanding items are resolved to the required standard
DSC01573

Step-In Supervision

We also provide experienced supervisors for builders who need capable site management cover at short notice. When a supervisor is unavailable and a project needs to keep moving, our personnel can step in and keep the site running without disruption.

About the BOSS Crew

Our supervisors and carpenters are qualified and experienced commercial construction personnel, holding White Card and all standard site accreditations. They understand commercial construction processes, manage trades directly and handle the full defects scope without adding to your team’s workload.

OUR PROJECTS

Shenton Quarter

Project Details

Location:

Shenton Park, Perth

Year:

2024

Contract Value:

$4 million

Scope:

limited

When the developer and builder parted ways mid-build on a Shenton Park development, an eastern states-based builder called upon Boss Group to step in and assist in completing the project. Taking full ownership of a massive, multi-faceted scope, we provided everything from site supervision to final finishes.

Our delivered scope included controlled demolition, ceiling and wall fixing, external soffit linings, wall cladding, second-fix carpentry, timber flooring, and the supply and installation of cabinetry throughout. Additionally, our teams handled timber linings, mastic work, concrete grinding, general labouring, and site supervision to keep the program moving. Since handover, we have remained on-site for the developer, managing ongoing maintenance and the defect liability period works.

1985EB30-BFF8-4DEE-9061-D329FA8B1177

INCONTRO

Project Details

Location:

Jolimont, Perth

Year:

2022-2023

Contract Value:

$4 million

Scope:

limited
During 2022 and 2023, when construction resources across WA were at their most stretched, we delivered 41 prefabricated timber frame homes in Jolimont within 14 months. Our crews held telehandler licences and self-managed the unloading, staging and installation of all prefabricated panels, taking that coordination off the site team entirely. We also completed all second-fix works, supplied and installed feature timber balustrades, handrails, external seating and pergolas, and managed all external cladding across the full development.
default

Hyde Hotel

Project Details

Location:

Perth CBD

Year:

2025

Contract Value:

$4 million

Scope:

limited
What started as a fire door enquiry turned into a $4 million combined carpentry and ceiling contract. The heritage-era 121-room hotel required approximately 150 non-compliant door frames to be cut out of concrete walls and replaced with fire-rated installations, alongside feature ceiling works across lobby areas on every level. Working within an existing building with tight site access, our crews coordinated closely with other trades throughout the refurbishment to keep the program moving.
WEBSITE IMAGE RESIZE

Sarai Apartments

Project Details

Location:

North Fremantle, Perth

Year:

2025 – 2026

Contract Value:

$1.3 million

Scope:

limited

West to West engaged Boss Group WA on a full supply and install basis across their multi-residential development, spanning 87 apartments, 11 townhouses, and a premium penthouse fit-out.

Our team delivered the scope across the entire development, including the procurement and installation of fire doors, internal doors, cavity sliders, timber handrails, skirtings, and hardware.

As our first project with West to West, we were thrilled with the calibre of the West to West staff and the all-round co-ordination onsite. We look forward to a long working relationship with them.

IMG_7804-2-scaled-e1781751813923

Email Us

Name(Required)

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

ENQUIRE ABOUT YOUR PROJECT

Fill in the form and we will get back to you promptly. The more detail you can give us about your project, the better we can come prepared for the conversation.

Name(Required)
What service are you interested in?(Required)
When do you start?(Required)
Drop files here or
Max. file size: 100 MB.

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

    EXPRESSION OF INTEREST

    Fill out the form below and we’ll be in touch when a position that suits your capabilities comes up.

    Name(Required)
    Max. file size: 100 MB.

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.